GC EUROPE Fujivest Super User Manual

Page 20

Advertising
background image

20

20 min setting starting from mixing

Heating-up schedules

+

>

3.2.1 Process of a Quick Heating schedule (Speed technique)

QH

The investment is allowed to set for 20 min and then placed in the burnout furnace at the end temperature,
it is then allowed to heat soak at this temperature for a period as stated in the ‘Instructions for Use’ prior
to casting.

QH

Into furnace at end temperature between

700-900°C

SLH

Into furnace at room temperature.

Start heating schedule immediately!

Advertising