GC EUROPE Fujivest Super User Manual

Page 21

Advertising
background image

21

Focus Edition from GC

Perfectly cast objects

Heating-up schedules

>

>

3.2.2 Process of a Step- Heating schedule (Conventional technique)

SLH

The investment material is allowed to set for 20 min and then placed in the burnout furnace at room
temperature; it is then heated up in a series of temperature steps, before being heat soaked at the final
end temperature for a period as indicated in the ‘Instructions for Use’ prior to being cast.

High temperatures assuring a complete burnout
of all pattern materials, extra stimulated by a
“steam” effect

Advertising