Installing the Discharge Head

OPEN LINESHAFT

1. A-C Fire Pumps are provided with either a cast iron or fab

steel type head. Install the discharge head as follows:

2. If the stuffing box is assembled to the head, remove it and

all attached piping. See Figure 5 for the stuffing box pro-

vided for the A-C Fire Pump being assembled.

3. Remove coupling guard if provided. Attach a sling through

windows (hand holes) or thread two eyebolts in the head

driver support mounting holes diametrically opposite and

hoist discharge head over the protruding headshaft.

4. Orient the discharge head in the required position and

lower the head, centering the vertical hole with the head-

shaft or stub shaft protruding above the column. For

threaded column, continue to lower the discharge head

until the large threaded hole in the bottom of the discharge

head rests squarely on top of the column. Rotate the dis-

charge head, screwing it onto the column, butting the top

of the column tightly against the discharge head.

5. For flanged column, continue to lower the discharge head

until the discharge head engages the column. Install cap-

screws and secure discharge head to the column flange.

Tighten capscrews gradually in diametrically opposite

pairs.

6. Lift pump assembly high enough to allow rotation of the

supports. Realign and lower assembly. Install and tighten

remaining capscrews. Repeat rotation and tightening pro-

cedure, until all capscrews are uniformly tight.

7. Using a device with the capacity to support the weight of

the entire pump assembly, hoist bowl, column, and head

assembly and remove supports.

NOTE

: Eyebolts or sling should be rated to handle in

excess of the pump weight.

8. Lower bowl, column and head assembly, until discharge

head mounting flange engages base plate. Secure dis-

charge head to mounting plate. Check the levelness of the

discharge head in all directions, utilizing a spirit level

across the driver mounting surface of the discharge head.

Stuffing Box Installation

Assemble stuffing box in accordance with Figure 5, below.

STANDARD CONSTRUCTION

1. Position gasket on discharge head. Slide stuffing box

(616) down over shaft and into position on the gasket.

Secure stuffing box with capscrews.

2. Insert lantern ring (621) into stuffing box. Be sure it is prop-

erly positioned so that it aligns with the lubrication passage

in the stuffing box.

3. Grease the packing rings (620) for easier installation.

4. Twist the packing ring sideways to get it around the shaft

easily. Start the first ring into the stuffing box. When the

entire ring is worked in using the fingers, tamp it down

using a split wood bushing (or equal) and push the packing

ring down firmly. It must seal on the shaft and bore of the

stuffing box. Install all five (5) rings in this manner. Stagger

ring joints 90º apart. The split gland may be used as a tam-

per for the top ring.

5. Install the split gland and threaded nuts on the split gland

studs. Tighten nuts then relieve the nuts and tighten finger

tight. Attach bypass line to tube fitting in the stuffing box.

6. Final adjustment of the stuffing box must be made at pump

start up. This final adjustment applies to all stuffing box

styles.

7. A properly packed stuffing box should be loose enough to

allow the shaft to be turned manually.

Figure 5

CAUTION:

Do not bend or scrape the shaft protruding

above the column. This could result in bending or

damaging the shaft.

CAUTION:

Check that the split gland is square in

the stuffing box. Cocking can cause uneven compres-

sion of packing and damage to the shaft or sleeve.

CAUTION:

Do not overtighten packing or excessive

wear can occur on the shaft or sleeve.