Section 7 - Repair Parts

ORDERING PARTS

When ordering spare or replacement parts. The pump serial

number and size and type of pump must be given. This can be

found on the nameplate furnished with the unit. Give the com-

plete name and reference number of each part as indi-

cated on the applicable sectional drawings, Figure 12 or

Figure 13, and the quantity required.

STOCKING SPARE PARTS

Spare parts to be kept in inventory will vary according to ser-

vice, field maintenance, allowable down time and number of

units. A minimum inventory of one complete set of bearings

and one spare of each moving part is suggested.

RETURNING PARTS

A completed Return Material Authorization (RMA) form must

accompany all materials returned to the factory. The RMA

forms can be obtained direct form the factory or through your

A-C Fire Pump Systems representative. The RMA form must

be filled in completely and forwarded as directed thereon.

Parts being returned under warranty claim must have a com-

plete written report submitted with the RMA form.

CAUTION

: Returned material must be carefully pack-

aged to prevent transit damage – the factory cannot

assume any responsibility for parts damaged in transit.

KEYED CONSTRUCTION BOWL ASSEMBLY

1. Install key (730E) into pump shaft keyway, slide impeller

(673) over shaft and locate it on the key.

2. Install split thrust ring (725) on pump shaft groove and

secure to impeller with capscrews (759E).

3. Slide intermediate bowl (670) over pump shaft and secure

to suction bell (689) with capscrews (759E).

4. Repeat preceding procedures for the number of stages

required.

FINAL ASSEMBLY

After assembly of bowl assembly, reassemble pump as

described in Section 3, Installation. Refer to Section 4,

Operation for startup and adjusting procedures.