3 commissioning, 1 scope of delivery, Commissioning – YSI CR 4200 Thermoreactor User Manual

Page 11: Scope of delivery, 3commissioning

Advertising
background image

CR 4200

Commissioning

11

ba76121e01

09/2012

3

Commissioning

3.1

Scope of delivery

 Thermoreactor CR 4200
 Connection cable for mains connection
 Operating manual

Warning

Always keep the original packing including the inner packing. If
you have to transport the instrument, the packing protects the in-
strument optimally from hard shocks.
The original packing is also required for the appropriate return
transport of the instrument if it has to be repaired.
Please note that the warranty does not cover damage caused by
inappropriate transport.

Advertising