YSI IQ S ENSOR N ET System 182 User Manual

Page 49

Advertising
background image

System 182

Installation

3 - 35

ba76022e01

12/2011

Fig. 3-28 Prepared 24 V AC/DC line.

Connecting the 24 V AC/

DC line

Fig. 3-29 Inserting the 24V AC/DC line

4

Open the enclosure of the Universal Transmitter.

5

Screw a cable gland (pos. 1 in Fig. 3-29) with sealing ring (pos.
2) into the enclosure below the 24 V AC/DC connection.

6

Loosen the coupling ring (pos. 3).

7

Feed the 24 V AC/DC line through the cable gland into the
enclosure. When doing so bend the flexible divider (pos. 4) to
the right.

1
3

2

4

Advertising