Xylem MM 231F Series 42/42S Low Water Cut-Offs/Pump Controllers User Manual

Page 5

Advertising
background image

5

L

K

f. Reinstall gauge glass and trim to ‘Y’ fittings (K, L).

Note: Make sure gauge glass valves are fully open.

L

K

d. • Install upper ‘Y’ fitting (K) into upper 1/2” NPT

gauge glass tapping on boiler.

• Install lower ‘Y’ fitting (L) into 1/2” NPT gauge

glass tapping on boiler.

S

R

P

Q

M

BB

Z

W

T

Y

AA

V

U

X

N

O

e. • Screw reducer bushing (O) and nipple (N) into top 1” NPT

tapping (P).

• Screw reducer bushing (Q), nipple (R) and blow-off

valve (S) into bottom 1” NPT tapping (T).

• Screw lower union tailpiece (V) with nut (U) into either

1/2” NPT lower tapping (W, X). Screw 1/2” NPT pipe
plug into unused lower tapping.

• Screw upper union tailpiece (Z) with nut (Y) into ‘Y’

casting (M) 1/2” NPT tapping (AA).

• Slide ‘Y’ casting (M) and compression nut (BB) over

nipple (N).

• Connect upper and lower union nuts (U, Y) to ‘Y’ fittings

(K, L) installed in boiler gauge glass tappings.
Note: ‘Y’ fitting (M) will have to be moved up or down
nipple (N) to mate union halves.

• Tighten compression nut (BB).

Advertising