Xylem MM 244B Series 42S Replacement Snap Switch Assembly User Manual

Page 9

Advertising
background image

9

PUMP
ON

PUMP
OFF

BURNER
CUT-OFF LEVEL
AT CAST LINE

H

ADD ADHESIVE HERE

G

PUMP SET SCREW

PUMP SWITCH

5b. If the Pump Off point does not match the

one shown in chart for the control (page 3)
and as measured on the "Switching Level
Ruler", dig the inspection lacquer out of the
socket in the set screw (G) above the pump
switch in the actuator assembly using an
awl.

c. Using an Allen wrench with a 5/64" hex, turn

the screw 1/4 turn:
- clockwise (if the “Pump Off” point is too

high when viewed from top)

- counterclockwise (if the “Pump Off” point

is too low when viewed from top)

5d. Slowly drain the water in the boiler until the

pump turns on. Allow pump to fill the boiler
and observe the point on the ruler where
the water level shuts off.

PUMP

OFF

PUMP

ON

NORMAL BOILER

WATER LINE

3/4

"

(19mm)

5a. Slowly drain the water in the boiler until the

pump turns on. Allow pump to fill the boiler
and observe the point on the ruler where the
water level shuts off.

5e. Repeat steps 5a. through d. as necessary

to match the specified Pump Off point spec-
ification.

f. Apply one drop of adhesive (furnished) to

the set screw threads (H) above the pump
switch in the actuator assembly.

5 - Setting the Operating Points of the Pump Switch

Advertising