Franklin Fueling Systems TSP-LPGF Float User Manual

Tsp-lpgf float

Advertising
background image

TSP-LPGF Float

Installation Instructions with Tank Isolation Sleeve

©2008 FFS 000-0094 Rev. B

The TSP-LPGF float must be installed before securing the

customer supplied isolation sleeve into the LPG storage

vessel.

1. Remove the retaining ring from the end of the

isolation sleeve.

2. Orient the float on the shaft so that the “M” is on the

top. Slide the TSP-LPGF over the end of the isolation

sleeve.

3. Re-install the retaining ring.
4. Using the isolation sleeve manufacturer’s installation

instructions, carefully install the isolation sleeve into

the opening in the LPG storage vessel making sure

the float is not damaged in the process. Puncturing

the float may impede its function.

5. After completing the installation of the isolation

sleeve according to the manufacturer’s installation

instructions, slide a Franklin Fueling Systems TSP-

LL2 probe into the isolation sleeve.

6. Seal the area between the isolation sleeve and the

TSP-LL2 probe using silicone RTV or equivalent

outdoor sealant.

Refer to Franklin Fueling Systems TSP-LL2 Probe

Installation Instructions for probe installation and operation

information.

M

Franklin Fueling Systems

TSP-LL2 probe

Franklin Fueling Systems

TSP-LPGF float

Customer-supplied tank

isolation sleeve retaining ring

Apply sealant here

(Step 6)

Customer-supplied tank

isolation sleeve

“M” marks location of

magnets

Advertising