Operation, 1 rcu start-up and test procedure, 3operation – Alpha Technologies CFR Redundant Control Unit User Manual

Page 12

Advertising
background image

10

3

Operation

3.1

RCU Start–Up and Test Procedure

Figure 3.1

RCU Power Up

2

1

Press the Select 1

contactor switch.

Switch ON both
circuit breakers.

STEP 1: RCU Power Up

WARNING: Before starting, turn OFF the Input 1 and 2 Circuit Breakers and the Load(s).

NOTE: If there is any type of logic or contact failure during the system start-up, test or opera-
tion, the Red Alert LED turns ON.

Switch the Input 1 circuit breaker OFF.

The Input 1 LED on the front panel will go out, showing the loss of primary power. As the
RCU transfers to the secondary power source the Contactor 2 LED turns ON.

NOTE: There will be a five second delay between the transfer from Input 1 to Input 2. This
conforms to the automatic transfer switch safety code.

STEP 2: Test Primary Power

Turn OFF

Input 1 circuit breaker

Contactor 2 LED

Figure 3.2

Testing Primary Power

Input 1 LED

1

Advertising