2 tools and test equipment – Alpha Technologies CXDS-M 600_600-19 User Manual

Page 18

Advertising
background image

9400002-J0 Rev A

16

3.1.2 Installation Component Requirements

Supplied

• Internal DC cables

Not Supplied

• Rack mounting hardware
• External DC conduit, cable and fittings

3.2 Tools and Test Equipment

Insulated tools are essential for a DC power system installation. Use the following list as a guide:
• Slot head screwdrivers (blade sizes: 1/4”, 1/8”, 1/16”)
• Phillips head screwdriver, #2 (tip size 3/16”)
• Digital voltmeter equipped with test leads
• Adjustable 24/48Vdc load (optional)
• Anti-static wrist strap
• Computer (laptop) with Microsoft® Internet Explorer 7 or greater
• Crossover cable RJ-45 (to connect a laptop to the Ethernet port)
• Null modem cable (for access using the RS-232 port)
• Cutters and wire strippers (#14 to #22 AWG) [2.5 – 34 mm

2

]

Advertising
This manual is related to the following products: