4 installation – Alpha Technologies CXPS-HD 48-1.2-225 User Manual

Page 18

Advertising
background image

0530082-J0 Rev B

Page 10 of 31

4 Installation

Only qualified personnel should install and connect the power components within the Alpha power system. For
battery installation, refer primarily to the manufacturer’s manual. Refer to the drawings located at the rear of this
manual.

4.1 Safety

precautions

Refer to the important safety instructions near the front of this manual.

4.2 Tools

required

Appropriate insulated tools are essential for the installation. Use this list as a guide:

x Battery lifting apparatus

x Electric drill with hammer action, ½" capacity

x Crimping tools and dies that match lugs used in the installation

x Load bank of sufficient capacity to load the largest rectifier into current limit

x Digital voltmeter with test leads

x Cable

cutters

x Torque

wrench:

¼" drive, 0 - 150 in-lb.

x Torque

wrench:

Ƙ" drive, 0 - 100 ft-lb.

x Insulating canvases (2' x 2', 1' x 1', 3' x 3', etc.)

x Insulated hand tools, see Figure 4:

-Combination wrenches

-Ratchet and socket set

-Various screwdrivers

-Electricians knife

x Battery safety spill kit required for wet cells:

-Protective clothing

-Face shields

-Gloves -Baking

soda

-Eye wash equipment

x Cutters and wire strippers 0.08 - 6 mm

2

(#28 to #10 AWG)

Figure 4–Example of an insulated tool kit