Hot gas reheat – AAON M1-011 User Manual

Page 32

Advertising
background image

32
































The ASC fitting will come installed by the factory.
Should you need to re-install the ASC fitting in the
field, then do so according to the following procedure:

9. Hot Gas Reheat

Although the evaporator reduces moisture content
from warm, moist air being conditioned, the space
thermostat is a dry bulb device and will not call for
refrigeration if outdoor and space temperatures are
mild but very humid and the space temperature is
satisfied. However, the humidity level may cause the
space to be uncomfortable. A reheat system is used
to correct this condition. To prompt operation of the air
conditioning system, a humidistat is required and to
avoid cooling the space excessively while removing
moisture, a coil which accepts discharge gas from the
compressor is located downstream of the evaporator.
The function of this coil is to heat the air that has been
cooled by the evaporator to approximate room
temperature. A reheat valve is installed in the
compressor discharge line to divert discharge gas to
the reheat coil when the humidistat calls for
dehumidification but returns all discharge gas to the
condenser when cooling is required.

Note: No additional piping is required for
modulating hot gas reheat!

Figure 9.1, AAON’s Modulating Reheat System







Condenser

Coil

Reheat Coil

Evaporator

Coil

Compressor

Reheat
Control

Valve

Control

Board

Supply Air

Sensor

Wiring to

Reheat Control

Valve

Suction Line

Liquid Line

Field Piping

Air Handling Unit

Condensing Unit

Evaporator

Coil

Air Handling Unit

Refrigerant Line

Connections

Suction

Hot Gas

Liquid

TXV

Figure 8.3, HGBP Connection to Evaporator & ASC Fitting

Figure 8.4, ASC Fitting at
Distributor, Exploded View

Refrigerant Flow (Liquid)

Expansion Valve Outlet

Distributor Ring

Distributor Nozzle

Hot Gas Bypass Line

(From Condenser)

Refrigerant Flow

(Bypass Gas)

Distributor

Auxiliary Side

Connector (“ASC”)

ASC

1. Install nozzle and ring in ASC (orientation as shown)

– remove from distributor if necessary.

2. Install ASC on distributor inlet.
3. Install expansion valve on ASC inlet.
4. Install liquid line.
5. Install hot gas bypass line.

Advertising
This manual is related to the following products: