Fig. 10 – Burkert Type 8045 User Manual

Page 24

Advertising
background image

20

Installationandcommissioning

- Always mount the device upstream a possible injection point in the pipe of a high-conductivity fluid (for

example: acid, base, saline,...).

Correct

flow direction

Incorrect

Correct

Incorrect

Fig. 10:

Air bubbles within the pipe

→

If necessary, use a flow conditioner to improve measurement precision.

7.2.2.

Installation into the pipe of a 8045 with a G2'' nut

In order to ensure a high accuracy of the measurements and good stability of the „flow zero“ point, install
the device into the processed medium at least 24 H before calibration.

1

2

3

5

4

6

FLOW

flow direction

Electrodes

→

Install the S020 fitting into the pipe taking into
account the recommendations in chap. “7.2.1”.

→

Check that there is a seal on the fitting and that it is
not damaged. Replace the seal if necessary.

→

Check that there is a seal (see mark 6, Fig. 11) on
the flow sensor.

→

Insert the nut (see mark 3, Fig. 11) on the fitting.

→

Insert the snap ring (mark 2, Fig. 11) into the
groove (mark 5, Fig. 11).

→

Position the device in order the arrow on the side of
the housing indicates the direction of the flow. the
totalizers will increment.

→

Insert the device (mark 1, Fig. 11) into the fitting.

→

Tighten the nut (mark 3, Fig. 11) by hand on the
device.

Fig. 11:

Installation into the pipe of a 8045 with a G2'' nut

7.2.3.

Installation into the pipe of a 8045 with a clamp connection

Observe the installation recommendations described at chap. 7.2. and in the operating instructions of the
S020 fitting.

In order to ensure a high accuracy of the measurements and good stability of the „flow zero“ point, install
the device into the processed medium at least 24 H before calibration.

English

Type 8045

Advertising