Plumb the sample and drain lines, Analyzer startup, User interface and navigation – Hach-Lange POLYMETRON 9523 User Manual User Manual

Page 21: User interface, Figure 8

Advertising
background image

Figure 8 SD card installation

Plumb the sample and drain lines

After the panel is attached to a wall, connect the sample and drain lines to the fittings on the panel.
Make sure that the tubing meets the

Specifications

on page 3. Refer to the steps that follow and

Figure 1

on page 7.

1. Insert the sample tubing into the input quick-connect fitting under the flow chamber (

Figure 1

on page 7).

2. Connect a drain line to sample output fitting. Keep the drain line as short as possible to prevent

back-pressure.

Analyzer startup

1. Open the degassing valve.
2. Open the sample flow adjustment valve and ensure everything is watertight and there are no

leaks.

3. Close the degassing valve when the measuring cell is free of air.
4. Set the sample flow to the required rate (between 5 and 20 L/h).
5. Pass about 10 liters of sample through the resin to thoroughly rinse it and prepare the analyzer

for measurements.

User interface and navigation

User interface

The keypad has four menu keys and four directional keys as shown in

Figure 9

.

English 19

Advertising