Installation, Electrical installation, Connect to ac power – Hach-Lange H-Series Meters Basic User Manual User Manual

Page 9

Advertising
background image

Figure 3 Handheld and benchtop meter components

1 Waterproof handheld meter

4 Benchtop meter

2 SmartLogger II software

5 USB cable

3 AA Alkaline batteries (4x)

6 AC-DC power supply kit (power supply and three

plugs: US, EU, UK)

Installation

C A U T I O N

Multiple hazards. Only qualified personnel must conduct the tasks described in this section of the
document.

Electrical installation

Connect to AC power

D A N G E R

Electrocution hazard. If this equipment is used outdoors or in potentially wet locations, a Ground Fault
Circuit Interrupt (GFCI/GFI) device must be used for connecting the equipment to its main power
source.

English 9

Advertising