Installation, Electrical installation, Connect to ac power – Hach-Lange H-Series Meters Basic User Manual User Manual
Page 9
Advertising
Figure 3 Handheld and benchtop meter components
1 Waterproof handheld meter
4 Benchtop meter
2 SmartLogger II software
5 USB cable
3 AA Alkaline batteries (4x)
6 AC-DC power supply kit (power supply and three
plugs: US, EU, UK)
Installation
C A U T I O N
Multiple hazards. Only qualified personnel must conduct the tasks described in this section of the
document.
Electrical installation
Connect to AC power
D A N G E R
Electrocution hazard. If this equipment is used outdoors or in potentially wet locations, a Ground Fault
Circuit Interrupt (GFCI/GFI) device must be used for connecting the equipment to its main power
source.
English 9
Advertising