CONTREX ML-Drive User Manual

Page 51

Advertising
background image

3 - 17

To find Follower Setpoint 1 (CP-03) for Example A:

Follower E.U. desired

15

Setpoint 1

=

________________________________

=

___

=

3

Lead E.U. operation

5

15 gal/min

The Follower Engineering Units (gallon per minute) at which
you want the Follower to operate.

Divided by

5 gal/min

The Lead Engineering Units that the Lead is operating at.

Equals

3.00

Follower Setpoint 1 (CP-03) value.

To find Follower Setpoint 2 (CP-04) for Example A:

Follower E.U. desired

22.5

Setpoint 2

=

________________________________

=

___

=

4.50

Lead E.U. operation

5

22.5 gal/min

The Follower Engineering Units (gallon per minute) at which
you want the Follower to operate.

Divided by

5 gal/min

The Lead Engineering Units (gallon per minute) that the Lead is
operating at.

Equals

4.50

Follower Setpoint 2 (CP-04) value.

Advertising