455 d c, Ontrol, Anel – Controlled Products Systems Group 1042011 User Manual

Page 15: Nstallation, Nstructions

Advertising
background image

RA

DI

O

1-455D115 = 115V

1-455D = 230V

F2

F1

M

M

K

+

OP

-

CL

+24 V

FSW

NC

-

B

-

STOP

A

+

TX

FSW

W. L.

LOCK

9

10 11 12 13 14 15 16 17 18 19

22 23 24 25

LAMP

COM OP

CL

MOTOR 1

MOTOR 2

CL

COM

OP

1

2

3

4

5

6

7

8

20 21

FC

A

1

FC

A

2

F

CC2

F

CC1

V1-4

61C455D

F

-

+

J2

J6

J4

J5

J1

J3

N

L

MAIN

Page 15

February, 20 09
400 O pe rator And
455 D Control Panel I nst allatio n M anual

C

ONNECT

THE

O

PERATOR

(

S

)

TO

THE

C

ONTROL

P

ANEL


WARNING!

Turn the main power off before

you make any electrical connections or before
programming.

C

AUTION

:

The operators are grounded only by

the grounded circuit the installer provides.

U

SING

A

J

UNCTION

B

OX


If an operator is more than 2 ft away from the control
panel, you must use a junction box for connection.

Use a U. L. Listed cord grip where the operator cord
enters the junction box.

Note: If you have a one-leaf gate design, the
operator must be connected to Motor 1

(terminals 1,2, & 3)

To wire up motor 1, connect the white wire to

terminal 1(on the J4 terminal strip), the black wire to
2, and the red wire to 3. Wire each leg of the capacitor
(supplied) to terminals 2 & 3.

Note: If you want to delay the closing of one gate
leaf in a two-leaf gate design, be sure to connect

its operator to Motor 1.

In order to wire motor 2 in a bi-parting system,
connect the white wire to terminal 4 (on the J4

terminal strip), the black wire to 5, the red wire to 6.
Wire each leg of the capacitor (supplied) to terminals
5 & 6.


C

HECK

THE

M

OTOR

S

D

IRECTION

OF

R

OTATION

WARNING! The pressure valves are not preset at

the factory and may operate a gate leaf with
enough force to endanger people and seriously
damage the gate leaf itself. Refer to your

operator’s installation manual to decrease the
hydraulic pressures before checking the motor’s
direction of rotation.

After you have connected the main power supply, and
the operator(s) to the control panel, you need to

check the direction of rotation for each operator
motor in your gate design.

Note: To check a motor’s direction of rotation,
you must have three closed circuits on terminal
block. Install one circuit between terminals 11

and 16 (already installed by factory), another
circuit between terminals “PHOTO OP/CL”, and
another circuit between terminals “PHOTO CL”.

Figure 9. The 455 D Control Panel

J3 terminal block for main

power supply

J4 terminal block for
connecting the operator(s)

J1 terminal block for low-

voltage accessories

J2 quick connector port

F Function Push Button

— Programming Push

Button

+ Programming Push

Button

FUSES

220
VAC

115
VAC

F1

Main Power

5 A

10 A

F2

Accessories

800
mA

800
mA

T

HE

455 D C

ONTROL

P

ANEL

I

NSTALLATION

I

NSTRUCTIONS

Advertising
This manual is related to the following products: