When you receive your 400 Operator, complete the

following steps.

Inspect the shipping box for physical damage such as
leaking oil or a torn carton. Then inspect the operator
after you remove it from the box. Notify the carrier

immediately if you note any damage. The carrier must
witness the damage before you can file a claim.

As you unpack the box, insure that all the following
parts included (see Figure 1). If you have ordered a kit
(a pair of operators), you will have twice the quantity

of parts listed below (except where noted).

1 400 Operator - 1 each
2 Protective Cover - 1 each
3 Protective Cover Tie-Rods - 2 each
4 Protective Cover End Cap - 1 each
5 Rear Mounting Bracket - 1 each
6 Rear Mounting Plate (optional) - 1 each
7 Short Brass Pin with 8mm nut and washer - 1 each
8 Rear Fork - 1 each
9 Long Brass Pin with 8mm self-locking nut - 1 each

10 Swivel joint with jam nut and washer - 1 each
11 Front mounting bracket with nut and bolt
12 Locking cap cover and key for Manual Release - 1 each
13 Electric Power Cord - 1 each
14 Manual Release Knob - 1 each

Figure 1. Parts of the 400 Operator

1

2

3

4

10

13

14