Sl-100 concrete pad, Concrete pad for sl-100 – Controlled Products Systems Group AOMSL100 User Manual
Page 6
Advertising

CONCRETE PAD FOR
SL-100
24”
9½”
24”
10”
RED HEAD BOLTS
½”X 3 ½”
FOUR PLACES
Area for conduit(s)
Operator concrete pad
Operator frame
Operator plastic cover
GATE TRACK
GATE
GATE TRACK
FOOTING
GATE TRACK
FOOTING
Minimum 5”
10”
8”
24”
4”
6.5”
When possible
Install 4” above
Ground
Footing for
Gate operator
Drive chain level
9
Advertising
This manual is related to the following products: