Sl-100 concrete pad, Concrete pad for sl-100 – Controlled Products Systems Group AOMSL100 User Manual

Page 6

Advertising
background image

CONCRETE PAD FOR

SL-100

24”

9½”

24”

10”

RED HEAD BOLTS

½”X 3 ½”

FOUR PLACES

Area for conduit(s)

Operator concrete pad

Operator frame

Operator plastic cover

GATE TRACK

GATE

GATE TRACK

FOOTING

GATE TRACK

FOOTING

Minimum 5”

10”

8”

24”

4”

6.5”

When possible
Install 4” above
Ground

Footing for

Gate operator

Drive chain level

9