Post mounting (sw470), Figure 2, Figure 1 – Controlled Products Systems Group SW4705011G3 User Manual
Page 8

8
POST MOUNTING (SW470)
NOTE: For the following instructions refer to figures 1 & 2.
1. Locate and anchor two posts made of 3” outer
diameter heavy walled pipe. Posts should be parallel
and square to the gate. (See figure 1)
IMPORTANT NOTE: The distance between mounting
posts and the relative location of the operator to the
gate and fence is critical.
2. Locate electrical conduit, as required, prior to pour-
ing concrete.
3. Set mounting post and electrical conduit in place.
Knockouts for 3” pipe clamps (not supplied) are pro-
vided in the operator.
FENCE
OPERATOR
3" O.D. PIPE
(2 REQ'D.)
CONCRETE PAD
16 X 32 MINIMUM
OPERATOR
3" O.D. PIPE
(2 REQ'D.)
CONCRETE PAD
16 X 32 MINIMUM
FENCE
23"
9.5"
30"
18.5"
23"
20"
PARALLEL MOUNT
PERPENDICULAR MOUNT
FIGURE 1
POWER AND CONTROL WIRING
SHOULD BE RUN IN SEPARATE CONDUIT
3" U-BOLT
(4 REQUIRED)
FIGURE 2