Post mounting (sw470), Figure 2, Figure 1 – Controlled Products Systems Group SW4705011G3 User Manual

Page 8

Advertising
background image

8

POST MOUNTING (SW470)

NOTE: For the following instructions refer to figures 1 & 2.

1. Locate and anchor two posts made of 3” outer
diameter heavy walled pipe. Posts should be parallel
and square to the gate. (See figure 1)

IMPORTANT NOTE: The distance between mounting
posts and the relative location of the operator to the
gate and fence is critical.

2. Locate electrical conduit, as required, prior to pour-
ing concrete.

3. Set mounting post and electrical conduit in place.
Knockouts for 3” pipe clamps (not supplied) are pro-
vided in the operator.

FENCE

OPERATOR

3" O.D. PIPE

(2 REQ'D.)

CONCRETE PAD

16 X 32 MINIMUM

OPERATOR

3" O.D. PIPE

(2 REQ'D.)

CONCRETE PAD

16 X 32 MINIMUM

FENCE

23"

9.5"

30"

18.5"

23"

20"

PARALLEL MOUNT

PERPENDICULAR MOUNT

FIGURE 1

POWER AND CONTROL WIRING

SHOULD BE RUN IN SEPARATE CONDUIT

3" U-BOLT
(4 REQUIRED)

FIGURE 2

Advertising
This manual is related to the following products: