Magnum Venus Plastech PATRIOT Duo 1:1 DUO-PAT-7-12-SIL User Manual

Page 24

Advertising
background image

Patriot Duo Unit Manual

Rev. 07/2012

Page | 24

DAILY SHUT-DOWN for PATRIOT DUO 1:1 UNIT


ACTIVITIES MUST BE DONE IN THE SEQUENCE SHOWN, AND MUST BE
CHECKED OFF AS COMPLETED.

ACTIVITY NO.

ACTIVITY

CHECK AS
COMPLETED

Priority

Put on Respirator as specified for spray painting,
Protective Clothing, Eye Protection, and PVC Gloves

1

Turn off the Main air ball valve at the Air manifold.

2

Check the Weep Holes on the top of the gun block for leaking
material – tighten the Packing nuts as needed.

3

Hang the gun with the front of the gun facing downwards.
There is no need to wipe the front of the Spatter Nozzle
assembly clean because it is easy to peel Silicon and similar
materials after they cured



ABNORMAL CONDITIONS OBSERVED AND CORRECTED

Abnormal Condition

a

a

a

a when
corrected



OPERATORS NAME _________________________________ DATE: ____________


SIGN OFF WHEN SHUT DOWN CHECKS ARE COMPLETED: __________________













Advertising