Magnum Venus Plastech PATRIOT Duo 1:1 DUO-PAT-7-12-SIL User Manual
Page 24

Patriot Duo Unit Manual
Rev. 07/2012
Page | 24
DAILY SHUT-DOWN for PATRIOT DUO 1:1 UNIT
ACTIVITIES MUST BE DONE IN THE SEQUENCE SHOWN, AND MUST BE
CHECKED OFF AS COMPLETED.
ACTIVITY NO.
ACTIVITY
CHECK AS
COMPLETED
Priority
Put on Respirator as specified for spray painting,
Protective Clothing, Eye Protection, and PVC Gloves
1
Turn off the Main air ball valve at the Air manifold.
2
Check the Weep Holes on the top of the gun block for leaking
material – tighten the Packing nuts as needed.
3
Hang the gun with the front of the gun facing downwards.
There is no need to wipe the front of the Spatter Nozzle
assembly clean because it is easy to peel Silicon and similar
materials after they cured
ABNORMAL CONDITIONS OBSERVED AND CORRECTED
Abnormal Condition
a
a
a
a when
corrected
OPERATORS NAME _________________________________ DATE: ____________
SIGN OFF WHEN SHUT DOWN CHECKS ARE COMPLETED: __________________