Magnum Venus Plastech ADVANTAGE User Manual

Page 51

Advertising
background image

Advantage Gelcoater

Weekly Maintenance Checklist

This schedule is based on a one shift, 5-day work week, using standard
GRP resin (an idle unit left with resin in it may require more frequent part
replacing.)

Part:

Procedure:

Gauges and Regulators

Check for wear, damage, and

proper operation

Resin Accumulator

Remove and clean inside

Resin Filter

Wash and inspect filter screen for
damage

Power Head

Clean silencer with solvent and

blow dry

Resin Pump Lower Assembly

Check pickup hose and wand for

leaks or damage. Check inside
the center section for packing
leaks.

Flush Tank

Clean any residue and rinse with
solvent.

Air Lines

Check for leaks, wear, and kinks.
Replace line as needed

47

Advertising