Luminex 200 Installation Guide User Manual
Page 42
Advertising

12. Attach the power cord to the input module on the back of the Luminex SD system.
Connect the CANBUS (short) cable to P1 on the back of the SD and to P2 on the back of
the analyzer. Plug the power cord into the power outlet. See the Back of SD System, P1
Port image below.
FIGURE 14.
Back of SD System, P1 Port
13. Turn on the power to the Luminex SD system. It will automatically prime, and stop when
the reservoir is 2/3 full.
In Vitro Diagnostic Use
Luminex 200 System Setup
31
Advertising