Luminex 200 Installation Guide User Manual

Page 42

Advertising
background image

12. Attach the power cord to the input module on the back of the Luminex SD system.

Connect the CANBUS (short) cable to P1 on the back of the SD and to P2 on the back of
the analyzer. Plug the power cord into the power outlet. See the Back of SD System, P1
Port
image below.

FIGURE 14.

Back of SD System, P1 Port

13. Turn on the power to the Luminex SD system. It will automatically prime, and stop when

the reservoir is 2/3 full.

In Vitro Diagnostic Use

Luminex 200 System Setup

31

Advertising