Tube installation sequence – Detroit Radiant Products Company DX3 Series User Manual

Page 11

Advertising
background image

Tube Installation Sequence

20 Foot

50 Foot

60 Foot

70 Foot

30 Foot

40 Foot

Stainless Steel Clamp on 150 - 200 MBH models (P/N: TP-220).

Figure 2.4

Tube Installation Sequence

Stainless Steel Clamp on 150-175 MBH models (P/N: TP-220).

Stainless Steel Clamp Location (P/N: TP-220).

Important! The combustion chamber & radiant tube sections must be installed in the following order.

80 Foot

Stainless Steel Clamp on 150 - 200 MBH models (P/N: TP-220).

Stainless Steel Clamp Location (P/N: TP-220).

Key

Burner Control Box with
16-inch Burner Tube

Black Coated Combustion
Chamber Tube*

Black Coated Aluminized Combustion
Chamber/Radiant Emitter Tube

Standard Tube Clamp

Stainless Steel Tube
Clamp (P/N: TP-220)

175-200 MBH models only - Located
between 1st and 2nd 10 ft. tube sections.

*Aluminized tubes (50,000 to 125,000 BTU/h models); Titan tubes (150,000 to 200,000 BTU/h models) .
NOTE: Refer to the Tube Heater General Manual, Chart 3.6 (page 23) for secured reflector joints.

Baffle Location

11

DX3

Series

2.0

Installation

Tube Sequence

Heater Length

Advertising