Adjust supply stop; fig. 9, Install flush valve; fig. 8a & 8b – American Standard SELECTRONIC 6065.565 User Manual

Page 6

Advertising
background image

M968699 Rev. 1.15

7

9

6

2

1

5

8

10

121mm,+13mm, -6mm

(4-3/4)(+1/2, -1/4)

Fig. 8b

5

Fig. 9

2

REMOVE COVER

CLOCKWISE CLOSES

CONTROL STOP

COUNTER-CLOCKWISE

OPENS CONTROL STOP

IMPORTANT: To avoid overflowing, the SUPPLY STOP

(3) must never be opened to the point where the flow

from the valve exceeds the flow capacity of the

fixture. The fixture must be able to handle a

continuous flow in case of a flush valve failure.

1. After installation is complete, peel off the

PROTECTIVE FILM

(1) from the sensor. Standing to one

side, block the sensor with your hand for 10 seconds.

Remove your hand and listen for audible “click” from

within the valve.

2. Remove COVER (2) from SUPPLY STOP (3).Turn on

water supply 1/4 turn to 1/2 turn(CCW) and test for leaks.

Note: Unit may flush for approximately 5 to 10 sec.

when water is first turned on. If flow persists, turn

water off and repeat step #1 above.

3. Actuate the FLUSH VALVE:

A) Cover sensor with hand for 10 seconds.

NOTE: Stand outside of sensor detection aera.

B) Remove hand from in front of the sensor; unit will

flush in approximately 3 seconds.

4. Adjust SUPPLY STOP (3) after each flush until the

stated flush volume is achieved, no splashing occurs and

the fixture is properly cleansed.

5. When adjustment is complete, replace COVER (2)

and tighten to ensure vandal-resistance.

ADJUST SUPPLY STOP; Fig. 9

7

3

Fig. 8a

3

2

5

1

1. As shown in Fig. 8a, insert the side INLET FLANGE (1)

on the FLUSH VALVE

(2) into the SUPPLY STOP (3).

Lubricate the INLET FLANGE O-RING

(4) with water if

necessary. Lightly tighten COUPLING NUT

(5). Fig. 8a.

Important: Do not use lubricants (other than water)

or any type of thread sealing paste or tape.

2. Align the FLUSH VALVE (2) (Fig. 8b) directly above

the DOWN TUBE

(7) and VACUUM BREAKER

COUPLING NUT

(6). Make sure that GASKET (10) is

installed.

Note: There is a +13mm, -6mm (+1/2, -1/4) tolerance

for the 121mm (4-3/4) dimension. Fig. 8b.

3. Pull the DOWN TUBE (7) up to meet the threaded

FLUSH VALVE CONNECTION

(8) and hand tighten

the VACUUM BREAKER COUPLING NUT

(6). Align all

components of the flush valve assembly.

Fig. 8b.

4. Lightly tighten the COUPLING NUT (5) connection

first, then the VACUUM BREAKER COUPLING NUT

(6) and finally the SPUD COUPLING NUT (9). Once

alligned correctly, use a wrench to tighten couplings to

make water tight connections.

Fig. 8b.

INSTALL FLUSH VALVE;
Fig. 8a & 8b

6

4

Advertising