INSTALLATION

E.O.D. Installation Instructions

Flush Mount - Weld On

A flush mount weld on application is used when an 8”

wide (minimum) embed channel is securely anchored

into the concrete at the dock edge, and the dock height

is adequate.

Installation Steps:

1. Remove all existing bumper material and

protruding objects from dock edge. Clean and

sweep dock edge free of debris and flammable

chemicals before installing unit.

2. At chosen location for Edge-of-Dock leveler,

locate the center of space and mark a point half of

the base plate width to the left and right.

3. Using a proper lifting device, raise and position

leveler on dock face with the top of the base plate

being flush with the top of the embedded channel.

Position ends of base plate to match up with

marks made previously.

4. Tack weld base plate to dock steel on left hand

end of the leveler. Check right hand end of base

plate, ensure that end is against dock steel and

that the top of the base plate is still flush with the

top of the embedded channel. Tack right hand

end to dock steel.

5. Position bump blocks out approximately 5/8” from

the edge of the inside flange of the bump block

to the end of the base plate. This will allow for

vertical welding of both the base plate and the

bump block flange back to the dock steel. Top of

the bump block cover plate should be flush with

the top of the embed channel. Tack weld bump

blocks to dock steel.

6. Check the positioning of the base plate and the

bump blocks.

7. Complete welding of tacked parts as follows:

A. Apply a continuous weld across top of each

bumper and base plate to dock steel. Skip

welding is acceptable to prevent warping,

but complete weld across the top must be

completed.

B. Weld vertically along each end of base plate

and on both inboard and outboard flanges of

bump blocks.

C. Fully plug weld all holes in base plate.

8. Installer must remove all welding slag, and repaint

welded areas.

9. Installer must adjust springs on all mechanical

Edge of Dock levelers to provide desired tension

for smooth operation. Stand in front of leveler, with

the unit raised and secured in the maintenance

position, loosen jam nut on the underside of the

linkage pin. To start allow about 3/4” to 1” of

threads between top of jam nut and linkage pin.

Using an open faced wrench, hold locknut on

inside of spring while tightening threaded bolt until

washer on top side of spring closes up tight to jam

nut. Test operation of unit. Further adjust spring

tension if needed by advancing jam nut toward

linkage pin and tightening threaded rod. After

desired unit operation is achieved, tighten jam

nut to outer washer on spring. Springs must be

adjusted alternately to have equal spring tension.

10. Before install is complete, installer must make

a final operational check of dock leveler to

verify all phases of install are correct. Installer

must complete, sign and return the Installation

Checklist upon completion. Reference page 24

NOTE

Pump should NOT be wired

while welding.