Installation – Poweramp HNL SERIES HYDRAULIC User Manual

Page 19

Advertising
background image

17

Manual No. 4111-0029

November 2009

May 2012

ground in front of lever, with the unit raised and

secured in the maintenance position, loosen jam

nut on the underside of the linkage pin. To start

allow about 3/4” to 1” of threads between top of

jam nut and linkage pin. Using an open faced

wrench, hold locknut on inside of spring while

tightening threaded bolt until washer on top side

of spring closes up tight to ram nut. Test operation

of unit. Further adjust spring tension if needed

by advancing jam nut toward linkage pin and

tightening threaded rod. After desired operation

is achieved, tighten jam nut to outer washer on

spring. Springs must be adjusted alternately to

have equal spring tension.

18. Before install is complete, installer must make

a final operation check of dock leveler to verify

all phases of install are correct. Installer must

complete, sign and return the Installation Checklist

up on completion. Reference page 24

INSTALLATION

Securely block or support ramp and lip when in

vertical positions. Lack of proper bracing can result

in ramp dropping during adjustment or installation

causing personal injury or damage to unit.

NOTE

DESCRIPTION

1

Top of base plate and bumper

cover plate to be flush with top of

ramp plate.

2

Apply continuous bevel weld across

both bumpers and length of base

plate.

(2)

Advertising