Direct Lift PP8 Plus Long User Manual

Page 22

Advertising
background image

22

more than 1/32” (0.8 mm), the sheave and sheave pin (shaft) should be replaced, refer to figures above.

3.

Hydraulic Cylinder

Inspect the hydraulic cylinder mounting to the runway. Inspect cylinder and hydraulic hoses for leaks. Repair or

replace as required.

1

Check and tighten the hydraulic cylinder rod nuts holding the cable pull bar.

4.

TRACKS for Rolling Jack and Oil Drain Pan

Inspect rolling jack/oil drain pan tracks for cleanliness, corrosion, excessive wear or damage. Clean dirty

tracks.


WARNING!

Worn or damaged tracks must be repaired immediately.

Failure to do so will lead to reduced service life which could result in property damage and/or personal injury.

5.

Latch Inspection and Adjustment

Check locking latches for proper operation. Inspect for worn or missing parts. Replace worn or damaged parts

and adjust as required.

1.

Latches

Check latch operation on all four corners.

2.

Latch and Latch Bar Line-Up

Observe locking latches during lift operation to ensure that all latches line up with slots in latch bar located in all

four columns. If not, relocate and/or re-shim columns.

1.

Check slack cable devices for proper operation. Inspect for worn or missing parts. Replace worn or dam

Advertising
This manual is related to the following products: