Smoker base/fryer-boiler assembly, Hose connection to smoker base/fryer-boiler, Installation of casting – King Kooker 2206 Heavy Duty Portable Propane Outdoor Smoker with Cooker Package User Manual

Page 10

Advertising
background image

10

Hose Connection to Smoker Base/Fryer-Boiler

(1)Refer to below diagram for depiction of proper hose installation.
(2)Tighten the hose fitting into the Venturi with a torque wrench, up to a torque of 95 to 105 lb./in.

Alternatively, hand tighten securely and then, using a wrench, tighten an additional 1-1 1/2 turns.

(3) If using this cooker as a fryer-boiler, go to the Use and Care Section of this manual for further

instructions. If using as a smoker base, continue on to the next page.

Installation of Casting

PARTS LIST:

(1) Top Frame with Attached Wind Shroud
(1) Bottom Frame
(4) Legs
(16) Lock Washers
(16) Nuts
(16) Philips Head Bolts
(1) Casting/Air Shutter
(1) Hose and Regulator
(1) 12” Deep Fry Thermometer

FIGURE 1

SMOKER BASE/FRYER-BOILER ASSEMBLY

1) Legs bolt to the outside of both the top and
bottom frames. Thread bolt through inside of frame
towards the outside. Hand tighten only until all legs
are installed.

2) Wrench tighten. Make sure all bolt sets are used
(16) and unit stands sturdily.

1. Remove top nut from casting bolt. Leave bottom nut attached and tightened.
2. Flip cooker upside down. Insert casting with the bolt pointed up through the shroud

opening.

3. Place the casting bolt through the hole on the flat bar. Place the heat plate onto

the casting bolt. The heat plate should rest against the base of the flat bar.

4. Reinstall nut to casting bolt. Tighten.
5. Turn cooker right side up. Check to see if casting is pointing straight up and is

sturdy.

Advertising