9060 cascade low voltage controller - installation – Ransburg 9060 LV Cascade Controller 80131-XXX User Manual

Page 21

Advertising
background image

9060 Cascade Low Voltage Controller - Installation

CP-13-07.2

16

For installations where it is required to run the
AC input wiring in conduit, perform the follow-
ing:

1. Ensure the AC line cord is unplugged

and remove the AC inlet receptacle wiring
from 1TB-N, 1TB-L1 and 1TB-EARTH
GROUND (See Figures 8 and 9).

2. Remove the mounting hardware from the

AC inlet receptacle and remove it from the
side of Controller.

3. Install the Conduit Adapter Plate (supplied)

in the hole where the AC inlet receptacle
was removed (see Figure 10).

4. Install the AC input wiring (0.8mm

2

(18AWG) minimum) through the Conduit
Adapter Plate using conduit and wire to TB1
as follows:

In general, conduit must be used for

approved AC installation, however, if na-
tional and local codes permit, the AC
power may be supplied via the factory
supplied line cord. If conduit is utilized,
the Controller AC input wiring may be
routed through an optional explosion
proof switch mounted on or near the
spray booth where it will be convenient to
the operator.

N O T E

Hot/Line

to 1TB-L1

Neutral/Common to 1TB-N

Ground

to 1TB-EARTH GROUND

Figure 8: Location of TB1 in Controller

Figure 9: TB1 Interlock Wiring

Figure 10: Installation of Conduit Adapter
Plate

TB1

Back of Cabinet

Conduit
Adapter Plate

SIDE VIEW

Advertising