NOTE:

Vent piping should be 12” over anticipated maximum snow level.


NOTE: Drawing is meant to demonstrate system venting ONLY.

All vent pipes must be glued, properly

supported, and the exhaust must be pitched a minimum of ¼” per foot back to the boiler to allow

drainage of condensate. When placing support brackets on vent piping, the first bracket must be within 1 foot of the boiler and the
balance at 4 foot intervals on the vent pipe. Boiler venting must be readily accessible for visual inspection for the first three feet from the
boiler.