J. diagram for vertical venting – HTP EFT-399 User Manual

Page 45

Advertising
background image

45

LP-387 REV. 6.10.14

J. DIAGRAM FOR VERTICAL VENTING

Figure 23

– LP-293-F

NOTE:

Vent piping should be 12” over anticipated maximum snow level.


NOTE: Drawing is meant to demonstrate system venting ONLY.

All vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of ¼” per foot back to the boiler to allow
drainage of condensate. When placing support brackets on vent piping, the first bracket must be within 1 foot of the boiler and the
balance at 4 foot intervals on the vent pipe. Boiler venting must be readily accessible for visual inspection for the first three feet from the
boiler.

Advertising
This manual is related to the following products: