Part 14, Maintenance, A. maintenance procedures – HTP EFT-399 User Manual

Page 78: Part 14 – maintenance

Advertising
background image

78

LP-387 REV. 6.10.14

Table 29









PART 14 – MAINTENANCE

A. MAINTENANCE PROCEDURES

Periodic maintenance should be performed once a year by a qualified service technician to assure that all the equipment is operating
safely and efficiently. The owner should make necessary arrangements with a qualified heating contractor for periodic maintenance of
the boiler. The installer must also inform the owner that a lack of proper care and maintenance of the boiler may result in a hazardous
condition.

BEFORE EACH HEATING SEASON a trained and qualified service technician should perform the inspections as per the boiler
inspection and maintenance schedule in the back of the manual. Failure to do so could result in death or serious injury.

Advertising
This manual is related to the following products: