Installation – Lincoln Electric P709 GUARDIAN CONTROL SOLUTIONS User Manual
Page 30

A-23
INSTALLATION
GUARDIAN CONTROL™ SOLUTIONS
A-23
FUNCTIONAL TESTING (GENERAL)
NOTE: Before performing any functional testing make
sure the Flame Guardian™ is disconnected to
prevent unwanted discharge. See Wiring
Diagram.
To perform any functional test, the following instruc-
tions should be followed.
1. Ensure that the Flame Guardian™ module(s) is/are
not connected to power source.
2. Perform the desired Functional Test. Sound alarm
will go off.
3. Check fire zone.
4. Press the
SIGNAL SILENCE
button on the
Guardian™ Panel to suppress alarm.
5. Press the
SYSTEM RESET
button.
To proceed with testing:
• Restart procedure.
If testing has been completed:
• Reconnect the Flame Guardian™ module(s).
• Make sure the panel is in RUN mode.
FUNCTIONAL TEST (SOLENOID VALVE)
The solenoid valve is provided with a button for testing
purposes.
1. Press button (A) and check that the compressed air
escapes from outlet R (B). See Figure A.19.
OIL GUARDIAN™ INSTALLATION
See Oil Guardian™ Instruction Manual for detailed
instalation instructions.
FIGURE A.19
A
P
R
A
B