Maintenance – Lincoln Electric P709 GUARDIAN CONTROL SOLUTIONS User Manual

Page 65

Advertising
background image

D-2

MAINTENANCE

D-2

GUARDIAN CONTROL™ SOLUTIONS

TABLE D.1 – MAINTENANCE CALENDER

ITEM

ACTION

INTERVAL TIME IN

MINUTES

NOTES

FILTER UNIT MULTI DUST BANK
DUST BIN

Emptying the dustbin, depends on dust load, but is
expected to be once every 2 weeks.

Inspection hatches allow easy visual inspection.
Cleaning of the SparkShield unit is normally in line
with cleaning of the inside of the ducting. The unit
is installed by means of quick release clamps.
Also the unit itself has a divisible housing. Actual
time needed for cleaning is around 45-60 minutes.
Some cleaning detergent.

2 weeks

1 x per

year

10

15

CARD D

Replacement cartridges

1 x per

year

90

SPARK GUARDIAN™
DUST BIN

Emptying

4 weeks

10

Depends on dust load, but is
expected to be once every 4
weeks.

HOUSING

Inspection

Cleaning the inside: is normally in line with clean-
ing of the inside of the ducting.

2 x per

year

10

60

Inspection hatches in the duct-
ing.

Has no moving parts.
Inspection hatches allow easy
visual inspection. Cleaning
interval of the unit depends on
dust load, oil content and oper-
ating hours.

OIL GUARDIAN™
COMPLETE
UNIT

General inspection and cleaning.

1 x per

year

60

FILLING LIME
STONE

50Kg Lime stone adding to the lime feeder

1 x 2

weeks

30

DETECTION

SMOKE
DETECTORS

Check polluting percentage above sensor

4 weeks

15

SMOKE
DETECTORS

Dry run on normal

1 x per

year

60

TEMPERATURE
SENSORS

Dry run on normal

1 x per

year

60

SPARK
DETECTOR

Dry run on normal

1 x per

year

60

SUPPRESSION

FLAME
GUARDIAN™

Visual inspection

2 x per

year

60

FLAME
GUARDIAN™

Replacement

10 years

120

Advertising