Installation, A-3 clearance requirements – Lincoln Electric IM10022 POWER WAVE AC_DC 1000 SD User Manual
Page 12

A-3
INSTALLATION
POWER WAVE
®
AC/DC 1000
®
SD
A-3
CLEARANCE REQUIREMENTS
The maintenance requirements of the Power Wave
®
AC/DC 1000
®
SD demand that enough clearance
behind the machine be maintained. This is especially
important where more than one machine is to be used
or if the machines are going to be rack mounted.
The rear portion of the machine that contains the filter
and the cooling fans slides out for easy access to
clean the heat sink fins.
Removing the four(4) clips and pulling back on the
rear portion of the machine will provide access for
cleaning the machine and checking the filter. The filter
is removed from the right side of the machine.
Where machines are mounted side by side, the
machine that is furthest to the right will need to have
the indicated clearance to the right side for filter
removal. See Figure A.1.
FIGURE A.1 - CLEARANCE REQUIREMENTS
61.30
22.63
33.00
WIDTH NEEDED FOR FILTER
MAINTENANCE ACCESS
FILTER REMOVAL
FROM SIDE OF MACHINE