<7. Operation>

7-1

IM 01C25B01-01E

7. Operation

7.1 Preparation for Starting

Operation

This section describes the operation procedure for

the EJ110, EJ120 and EJ130 as shown

in figure 7.1a (vertical impulse piping type, high-

pressure connection: right side) when measuring

the liquid flow rate, and EJ430, EJ440 and

EJ310 as shown in figure 7.1b when measuring

pressure.

NOTE

Check that the process pressure tap valves,

drain valves, and 3-valve manifold stop valves

on both the low pressure and high pressure

sides are closed, and that the 3-valve manifold

equalizing valve is opened.

(a) Follow the procedures below to introduce

process pressure into the impulse piping and

transmitter.

■ Differential Pressure Transmitters

1) Open the low pressure and high pressure tap

valves to fill the impulse piping with process

liquid.

2) Slowly open the high pressure stop valve to fill

the transmitter pressure-detector section with

process liquid.

3) Close the high pressure stop valve.

4) Gradually open the low pressure stop valve and

completely fill the transmitter pressure-detector

section with process liquid.

5) Close the low pressure stop valve.

6) Gradually open the high pressure stop valve. At

this time, equal pressure is applied to the low

and high pressure sides of the transmitter.

7) Check that there are no liquid leaks in the

impulse piping, 3-valve manifold, transmitter, or

other components.

■ Gauge/Absolute Pressure Transmitters

1) Open the tap valve (main valve) to fill the

impulse piping with process fluid.

2) Gradually open the stop valve to introduce

process fluid into the transmitter pressure-

detector section.

3) Confirm that there is no pressure leak in

the impulse piping, transmitter, or other

components.

Venting Gas from the Transmitter Pressure-

detector Section

• Since the piping in the example of figure 7.1

is constructed to be self-venting, no venting

operation is required. If it is not possible to

make the piping self-venting, refer to subsection

7.5 for instructions. Leave the equalizing valve

open even after venting gas.

(b) Turn ON power and connect the communicator.

Open the terminal box cover, and connect

the communicator to the SUPPLY + and

– terminals.

(c) Using the communicator, confirm that the

transmitter is operating properly. Check

parameter values or change the setpoints as

necessary.

See IM 01C25T03-01E (BRAIN

communication) or IM 01C25T01-06EN (HART

communication) for communicator operation.

If the transmitter is equipped with an integral

indicator, its indication can be used to confirm

that the transmitter is operating properly.

F0701.ai

Orifice

Tap valve

(high pressure)

Tap valve

(low pressure)

3-valve manifold

Drain valve

(high pressure)

Stop valve

(low pressure)

Stop valve

(high pressure)

Equalizing valve

Figure 7.1a Liquid Flow Measurement