Ab c d, Safety instructions, Material required for drilled well application – Burcam 506721 CONVERTIBLE C.I. JET PUMP 3/4HP 115/230V User Manual

Page 2: Monthly mandatory check-up

Advertising
background image

2

Safety Instructions:

This fine pump that you have just purchased is designed from the latest in material and

workmanship. Before installation and operation, we recommend the following procedures:

CHECK WITH YOUR LOCAL ELECTRICAL AND PLUMBING CODES TO ENSURE YOU COMPLY

WITH THE REGULATIONS. THESE CODES HAVE BEEN DESIGNED WITH YOUR SAFETY IN MIND.

BE SURE YOU COMPLY WITH THEM.

WE RECOMMEND THAT A SEPARATE CIRCUIT BE LEAD FROM THE HOME ELECTRICAL

DISTRIBUTION PANEL PROPERLY PROTECTED WITH A FUSE OR A CIRCUIT

BREAKER. WE ALSO RECOMMEND THAT A GROUND FAULT CIRCUIT BE USED.

CONSULT A LICENSED ELECTRICIAN FOR ALL WIRING.

THE GROUND TERMINAL ON THE THREE PRONG PLUGS SHOULD NEVER BE REMOVED. THEY

ARE SUPPLIED AND DESIGNED FOR YOUR PROTECTION.

NEVER MAKE ADJUSTMENTS TO ANY ELECTRICAL APPLIANCE OR PRODUCT WITH THE

POWER CONNECTED. DO NOT ONLY UNSCREW THE FUSE OR TRIP THE BREAKER, REMOVE

THE POWER PLUG FROM THE RECEPTACLE.

A

B

C
D

Material required for drilled well application

(indoor use only)

Shallow well pump installation

1 1 1/4’’ MNPT to 1’’ Barb reducer (150181).

Desired length of polyethylene 1” pipe, 100 PSI, CSA or UL

approved, to link up from pumping level to pump.

1 1” foot valve (750756 or 750752P).

1 well seal, as per well casing diameter

(750929 6” x 1”).

1 1” well seal elbow (750860).

2 1” male adaptors (750865 or 750871).

8 1” stainless steel clamps (750885).

Teflon tape.

Tank installation

Desired length of 1” braided hose (750919) to link up from

pump to tank. Keep tank as close as possible from pump.

1 tank T (650651).

1 drain valve (650659).

2 1” female adaptor.

1 1” male adaptor (750865 or 750871).

3 1” stainless steel clamps (750885).

Teflon tape.

Tools
Screwdrivers, hacksaw to cut pipe, knife to assist in pipe

cutting, round file to smooth pipe ends, pipe wrench,

adjustable wrench to tighten fittings, propane torch and

welding material.

Monthly Mandatory check-up:

1. Inspect the pump for any obvious condition that necessitates cleaning, correction, adjustement or repair.

2. Clear the surrounding of any paper, leaves or other debris.

3. Assure that the pump is secure for proper operation.

4. Assure that there is adequate clearance from any combustible materials or stucture. Stored materials must

be kept away from the pump. Shelves or cabinet structures must not be in close proximity over the pump.

5. Assure that the motor is securely plugged into a proper GFCI electrical outlet

6. Test the GFCI outlet by pressing its test switch. This should prove that the outlet is energized and will trip

off to protect against a ground fault. Be sure to reset the GFCI by pressing its reset switch.

7. Observe that the plumbing can carry the water safely into the residence.

Deep well pump installation

Desired length of polyethylene 1” and 1 1/4” pipe, 100 PSI,

CSA or UL approved, to link up from pumping level

to pump.

1 1 1/4” foot valve (750757 or 750753P).

1 well seal, as per well casing diameter

(750926 6” x 1 1/4” x 1”).

1 1” well seal elbow (750860).

1 1 1/4” well seal elbow (750861).

1 1 1/4” venturi adaptor (750864).

2 1” male adaptors (750865 or 750871).

1 1 1/4” male adaptor (750872).

8 1” stainless steel clamps (750885).

8 1 1/4” stainless steel clamps (750886).

Teflon tape.

Advertising