Hired-Hand Universal Ray Tube Heaters: AG1 Series User Manual

Page 8

Advertising
background image

8

2.0

Installation • Wiring

AG1

Series

Before field wiring this appliance - Check existing wiring; replace if necessary.

Note: If any of the original wire as supplied with the appliance must be replaced, it must be replaced with
wiring material having a temperature rating of at least 105° C.

Figure 2.3 • Internal Wiring Diagrams

A. Micro 60U-24 Ladder Diagram

B. Micro 60U-24 Block Diagram

S

IC

1

LI

N

E

1

N

E

U

T

GN

D

N

E

U

T

T

H

P

R

O

B

E

V

A

LV

E

BK

BK

BK

BK

G

BR

W

BK

BK

W

W

N

R

BK

O

BK

BK

120VAC

L1

Blower

Indicator Lights

Pressure Switch

Ignitor

Ignition Module

Gas Valve

Flame Rod

B

W

R

BK

BK

BK

Ground

Neutral

Valve

Neutral

TH

Line1

SIC1

Probe

W

BK

BK

BK

BK

BK

BR

W

G

120VAC

N

L1

O

BK

W

BK

Terminal Block

Pressure Switch

Indicator Lights

Blower

Burner

Ignitor

Flame
Rod

Ignition Module

Gas Valve

Advertising