Super Saver XL CE Heater

4. Installation

4.1

Hanging The Heater

Chain Suspension

Cable Suspension

Mount heater with screw hooks and chains so that
back of heater is at least 305 mm (12 inches) from
ceiling and wall. Heater must be a minimum of 500
mm (20 inches) from floor, and located so livestock
and combustible materials are unable to come in
contact with heater or within 3 meters (10 feet) of hot
air discharge (Fig. 1)

If frequent height adjustment is required, use
cables and pulleys as shown in Fig. 2. Main
line cable would be connected to a winch (not
shown).

4.2

Directions For Leveling

Adjust cables or chains as required to level the heater. Use a carpenter's level to check that the
heater is level.

4.3 Installing

Dual-Flare

Duct

Install Dual-Flare duct (Fig. 3) as shown with sheet metal screws provided. This provides a multi-
directional heat flow that may be set by bending flaps.

4.4

Connecting The Gas Supply

For gas connection (Fig. 4) attach regulator to the Hi-Pressure Line (A) at outside of building.
Connect flexible hose (B) to low pressure end of regulator with special brass coupling. See page
1 for LP, natural gas, and LHV natural gas requirements.































Fig. 1

Suspend heater from

ceiling with chains if

heater is to remain fixed.

Fig. 2

Suspend heater with
pulleys and chains if
frequent adjustment
is required.

Fig. 3

Fig. 4

Gas regulator

Hi-Pressure Line

Adjust flap
to direct
heat flow.