LumaSense Technologies 3434i SF6 Leak Detector User Manual
Page 42

Chapter 4
______________________________________________________________________
_____________________________________________________________________________
BE6028-14
3434i SF6 Leak Detector
LumaSense Technologies A/S
Page 42 of 191
Stand-alone Settings
Monitoring Task Set-up Number = 1
Sampling = Continuous
Monitor for pre-set period = No
Compensate for Water Vapour
Interference = Yes
Compensate for cross-interference =
No
Measure Gas A: XXXXXX = Yes
Measure Water Vapour = Yes
Note: flushing is set in Environmental
, and the
S.I.T’s are set up in the Filters setup,
1. Press SET-UP, S1 and then S1.
This brings you into the Monitoring Task branch of the Set-Up Tree
where the following text is displayed:
Up to 10 different monitoring tasks can be set-up while operating the
Monitor in Set-up mode. The parameters describing these tasks are
automatically stored in the memory of the Monitor.
2. If the number on the display is already “1” then press q to
“accept” the value.
If the number is not “1”:
a.
Press
¿
and use the direction keys to change its value to “1”.
b.
Press
¿
to accept the value.
The text which appears on the display during the next step is really
self-explanatory and it is therefore possible for you to follow why the
MONITORING TASK SET-UP NUMBER 1
PRESS ENTER TO CHANGE VALUE