页 18, Troubleshooting problem symptom solution – Nature Power 2000W-48V Marine Grade Wind Turbine (70701) User Manual

Page 18

Advertising
background image

16

12. Troubleshooting

Problem

Symptom

Solution

Insufficient charging

current to the battery

bank when the rotor is

running

Insufficient wind speed,

below the start-up one

(11 KPH, 7 MPH)

Wait for better wind

speed condition

Rotor and/or yaw

bearings within the

break-in period

They requires about

60-100 hrs. of operation

in normal wind speed

(18-20 MPH) before

they are running at

peak efficiency

Rotor shaft gets stuck

and rotates with

difficulty

Rotor bearings

damaged (rusted or

with dust). The bearings

need to be replaced

Stator and rotor

touching together

because of excessive

bearing waste. The

bearings need to be

replaced

Consistent air
turbulence condition
(1)

Change the location

and/or increase the

height of the tower/

mast. Make sure to

install the turbine 25 ft.

(7.6 m) on open ground

or 20 ft. (6m) above

nearby obstructions

The yaw is not moving

360° freely so the

turbine is not pointing

toward the wind

direction

Rotor bearing damaged

(rusted or with dust).

The bearing needs to

be replaced.

The pole/mast is not
standing straight up.
It needs to be in a
perfect vertical position

Generating power at

controlled rpm

This is normal when the

wind speed and/or the

battery bank voltage are

close to their highest

limits. For more details

see the Indicator Light

on the operating status

table. The unit will

resume normal rpm

operation in an automatic

and unattended way.

Advertising