Start-up – KROHNE OPTISONIC 6300 Quickstart EN User Manual
Page 44

3
START-UP
44
OPTISONIC 6300
www.krohne.com
07/2009 - 7.30959.24.00 - QS OPTISONIC 6300 R04 en
• X9.7: Confirm or adjust the reading with the actual distance on the rail.
• X9.8: Optimization loop. Repeat steps X9.8.1...X9.8.5 until the advised mounting distance does
not change more than 0.5%.
• X9.8.1: Optimise distance?
• X9.8.2: Read the velocity of sound of the fluid
• X9.8.3: Continue?
• X9.8.4: Confirm or adjust the velocity of sound
• X9.8.5: Read the advised mounting distance and reposition the transducer
• X9.9: Read the preliminary volume flow
• X9.10: Path ready? Enter "Yes". If you have:
1 path or pipe: you are finished, proceed with X9.12
2 paths: go to X9 for the 2
nd
path
2 pipes: go to X10 for the 2
nd
pipe
• X9.12: End Installation? If you enter "No" the installation is not saved, go to X9. If you enter
"Yes" the installation is saved and the measurement screen will appear.
• Mount the cover (see section "mounting the cover" in chapter "General mechanical
installation")
.book Page 44 Wednesday, August 19, 2009 8:37 AM