Installation, 11 measurement setup for steam measurement – KROHNE OPTIBAR PC 5060 C EN User Manual
Page 24
Advertising
3
INSTALLATION
24
OPTIBAR PC 5060 C
www.krohne.com
04/2014 - 4003437201 - MA OPTIBAR PC 5060 C R01 en
3.11 Measurement setup for steam measurement
The following points should be observed in this application:
• The pressure transmitter should be connected via a siphon to protect the measuring cell
from non-permitted high temperatures.
• Siphon to be kept free of insulation.
• When using superheated steam, the siphon must be filled with water prior to start-up.
Figure 3-8: Measurement setup for steam measurement
1 Pressure transmitter
2 Shut-off valve
3 Siphon
4 Tapping point
.book Page 24 Friday, May 2, 2014 12:49 PM
Advertising