Installation, Panel installation, Battery installation/replacement – Badger Meter Test Equipment User Manual

Page 6: Installation 6

Advertising
background image

INSTALLATION

Panel Installation

Slide the included gasket over the rear of the unit Place the unit in the panel through a 33 mm x 68 mm cutout Use the

provided panel mount screws to tighten the mounting clips until there is a secure seal against the gasket Do not over tighten

Slide the mounting clips into the grooves in the side of the ER-10

Du ran t

Recommended

Panel Cutout

2.677" (68 mm)

1.299"
(33 mm)

RST

T / R

8-digit LCD

display

®

Front View

Reset/

programming

button

Plastic

front panel

sealed to

meet

NEMA 4X

Mode select/

programming

button

Gasket installed

Install mounting clip

Figure 1: Panel installation

Battery Installation/Replacement

The ER-10, ER-10/R & ER-10H are powered by one 3V Lithium battery each To replace or install the battery, remove the battery

cover by pushing inward and down, in the direction of the arrow Install the battery in the slot Once the battery in place, the

unit goes into a self-test mode, and all the segments on the LCD display illuminate To exit the self-test mode, press

The

unit then displays the model number 10 for the ER-10 Press

again to ready the unit for operation

Figure 2: Battery installation

Model ER-10, ER-10/R & ER-10H Industrial Register

Page 6

September 2013

Advertising