Pressure drop charts, Operational startup, Avertissement – Badger Meter 1100 User Manual

Page 7: Attention, Pressure drop vs flow rate

Advertising
background image

Pressure drop charts

PRESSURE DROP CHARTS

1

(34)

10

(343)

100

(3429)

1000

(34,286)

8000

(274,236)

0.5

(17)

Pressure Drop vs Flow Rate

Pr

essur

e Dr

op PSID

Flow Rate GPM

(BPD)

1

0.1

10

30

1-1/2”

3/8”

1/2”

3/4”

7/8”

1”

2”

3”

4”

6”

8”

10”

1

(1.44)

10

(14.4)

100

(144)

1000

(1440)

10,000

(14,400)

30,000

(57,600)

Pressure Drop vs Flow Rate

Pr

essur

e Dr

op Bar

Flow Rate LPM

(m³/Day)

0.1

0.01

0.005

1

2

1-1/2”

3/8”

1/2”

3/4”

7/8”

1”

2”

3”

4”

6”

8”

10”

Figure 5: English units pressure drops

Figure 6: Metric units pressure drops

OPERATIONAL STARTUP

Follow these steps when installing and starting the meter .

MAKE SURE TO SHUT OFF FLUID FLOW AND RELEASE PRESSURE IN THE LINE BEFORE ATTEMPTING TO INSTALL THE

METER IN AN EXISTING SYSTEM.

AVERTISSEMENT

ASSUREZ-VOUS QUE LE FLUX DE FLUIDE A ÉTÉ COUPÉ ET DE LA PRESSION DANS LA LIGNE A ÉTÉ LIBÉRÉE AVANT

D’ESSAYER D’INSTALLER LE MÈTRE DANS UN SYSTÈME ACTUEL.
After meter installation, close the isolation valves and open the bypass valve . Allow liquid to flow through the bypass valve for

sufficient time to eliminate any air or gas in the flow line .

HIGH VELOCITY AIR OR GAS MAY DAMAGE THE INTERNAL COMPONENTS OF THE METER.

ATTENTION

DES DOMMAGES PEUVENT ÊTRE PROVOQUÉS EN FRAPPANT UN MÈTRE VIDE AVEC UN JET D’ÉCOULEMENT DE VITESSE

ÉLEVÉE.
5 . Open the upstream isolating valve slowly to eliminate hydraulic shock while charging the meter with the liquid . Open the

valve to full open .

6 . Open downstream isolating valve to permit meter to operate .
7 . Close the bypass valve to a full closed position .
8 . Adjust the downstream valve to provide the required flow rate through the meter .

OTEE:

N

If necessary, use the downstream valve as a control valve .

Page 7

July 2014

TUR-UM-00014-EN-03

Advertising