Disassembly, Turbine replacement – Badger Meter 1100 User Manual

Page 9

Advertising
background image

Turbine replacement

Disassembly

1 . Refer to

Figure 7

,

Figure 8

and

Figure 9

for relative positions of repair kit components .

2 . Remove the magnetic pickup from the meter body to avoid damage during repair .
3 . Remove the retaining ring from one end of the meter .
4 . Remove the rotor support from the body . If the rotor support is jammed in the body, use a pair of pliers or vise-grips to

break the rotor support free .

5 . The rotor may also be removed at this time .

OTEE:

N

4 in . and larger meters have two retaining rings (one on either side of the rotor) that require removal before the rotor

can be removed (see

Figure 9

) .

6 . Remove the retaining ring from the opposite side of the meter .
7 . Remove the second rotor support .

FLOW

Flow Direction

Arrow

Flow Direction

Arrow

Flow Direction

Arrow

Flow Direction

Arrow

Rotor

Assembly

Upstream

Rotor Support

Retaining Ring

Retaining Ring

Flow Meter

Body

Downstream

Rotor Support

Retaining Ring

Groove

Retaining Ring

Groove

Magnetic

Pick-up

Figure 7: Component positions for B110-375…B111-115 and B111-121

FLOW

Flow Direction

Arrow

Flow Direction

Arrow

Flow Direction

Arrow

Flow Direction

Arrow

Rotor

Assembly

Upstream

Rotor Support

Retaining Ring

Retaining Ring

Flow Meter

Body

Downstream

Rotor Support

Retaining Ring

Groove

Retaining Ring

Groove

Magnetic

Pick-up

Figure 8: Component positions for B111-120 and B111-130

FLOW

Flow Direction

Arrow

Flow Direction

Arrow

Flow Direction

Arrow

Flow Direction

Arrow

Rotor

Assembly

Upstream

Rotor Support

Retaining Ring

Retaining Ring

Retaining Ring

Retaining Ring

Flow Meter

Body

Downstream

Rotor Support

Retaining Ring

Grooves

Retaining Ring

Grooves

Magnetic

Pick-up

Figure 9: Component positions for B111-140 and B111-200

Page 9

July 2014

TUR-UM-00014-EN-03

Advertising