Pipe orientation and sensor mounting, Installation instructions, single support, Gas or liquid with proper bleeding – Badger Meter AHL - Hot Tap, High Pressure (2 to 30")" User Manual

Page 4: Liquid

Advertising
background image

Ellipse® Pitot Tube Meter, AHL Annular High Pressure Hot Tap Meter

Page 4

April 2014

PIPE ORIENTATION AND SENSOR MOUNTING

Gas or Liquid

with Proper

Bleeding

10°

10°

FLOW

Field Weld

H

L

SCH/WALL

MOD/β
DIA/ID
CAP
DP
TAG

FLOW METERS
W/O

SCH/WALL

MOD/β
DIA/ID
CAP
DP
TAG

FLOW METERS
W/O

Liquid

10°

10°

FLOW

Field Weld

H

L

SCH/WALL

MOD/β
DIA/ID
CAP
DP
TAG

FLOW METERS
W/O

SCH/WALL

MOD/β
DIA/ID
CAP
DP
TAG

FLOW METERS
W/O

Figure 2: Horizontal pipe installation

INSTALLATION INSTRUCTIONS, SINGLE SUPPORT

1 . Choose the proper location to install the AHL Annular High Pressure Hot Tap Meter using AGA/ASME standards (or

equivalent) . See

Figure 2

,

Figure 5

and

Figure 6

.

2 . Grind the surface of the pipe where the AHL Annular High Pressure Hot Tap Meter is to be inserted to provide a clean area

for welding .

3 . Weld the supplied thread-o-let to the pipe using standard codes for your application (1/16 in . weld gap recommended) .

Take care to protect the threads during the welding process .

4 . Thread the close nipple into the weld connector . Install the supplied 3-piece isolating ball valve .
5 . Mount the high pressure drilling machine onto the ball valve . Open the ball valve . Drill a hole through the pipe wall

according to

Table 2

.

Model/Sensor

Weld Connector

Drill Bit

AHL (7/8 in .)

1-1/4 in .

1-1/8 in .

AHL (1-1/4 in .)

1-1/2 in .

1-3/8 in .

Table 2: Single support drill bit size

OTEE:

N

There is no need for a drilling machine if it is not a hot tap installation or if the system is not pressurized .

6 . Withdraw the drill bit through the isolating ball valve, close the ball valve and dismantle the drilling machine . Make sure

there is no leakage at the valve and close nipple connections . The ball valve is to remain completely closed until step 9 .

7 . Install the cage nipple assembly and packing gland with the threaded rods assembly by threading it into the isolating ball

valve . Align the arrow on the sensor head with the direction of flow . See

Figure 4

and

Figure 5

.