Installation Instructions for Innotech Genesis Systems

Edition 011100

4-26

f.

Disconnect the RS232 cable between the PC and the controller.

g.

Repeat procedures in Paragraphs 4-1.7.2.1 through 4-1.7.2.3 for the other
controllers.

4-1.8.

FINAL SYSTEM CHECKOUT.

Final checkout of the system involves

checking the operation of the system, performing any necessary adjustments and verifying that
the system functions properly under normal operating conditions. Following are the
procedures for performing final system checkout:

a.

Apply normal operating power to the entire system in accordance with the applicable
manufacturers’ instruction manuals.

b.

Allow adequate time for the various units to stabilise. Unless specified otherwise in the
applicable instruction manuals, allow approximately one hour for the circuits to stabilise.

c.

Carefully check each unit of the system for proper operation. If necessary, the Gen2Mon
software may be used in the Monitor Mode (NOT in the Simulation Mode) to check
proper operation within the controller.

d.

Check manufacturers’ recommended adjustments and settings to ensure all units are set-up
for optimum function.

e.

At the controller enter final operational preferences such as schedules, passwords, flash
watches, etc.

f.

The system is ready for operation.